|
Brighter Signs™ Technology |
|
|
High-output fluorescent or HID internal signage
lighting |
·
|
|
Energy-saving Electrical Components |
|
|
Hi-pot tested Electrical Circuits |
·
|
|
Every Ballast Fused |
·
|
|
Pre-heat circuits individually tested at EVERY
socket |
|
|
Neon made In-House (NOT subcontracted) |
|
|
Computer Generated (exact) Neon Patterns |
|
|
Nickel-Flex Electrodes with Dumet alloy inner leads,
heavy-gauge solid-nickel corrosion-
proof 7-strand exterior leads and ceramic collars
used on all neon |
|
|
All Neon “burned-in” prior to installation (24 hours
minimum) |
|
|
Transformer loading checked by both voltage and
amperage tests |
|
|
Only Ground Fault Indicating transformers used in
this sign |
|
|
Only Translux high-voltage silicone-insulated wire
used during neon installation |
|
|
Neon Electrode Boots as required by Underwriter’s
Laboratory |
·
|
|
Only Glass tube/wire supports with stainless steel
bases used (NOT plastic) |
·
|
|
Sign meets Underwriter's Laboratory, National
Electrical Code, State and City Codes |
·
|
|
In-House Installation & Service (NOT subcontracted) |
·
|
|
All components will be new. |
·
|
|
All fasteners will be galvanized or non-corrosive. |
·
|
|
Signs attached to poles are Welded in Place |
·
|
|
The work area will be left in a broom-clean
condition |
·
|
|
Permit acquisition labor is included in this
quotation |
·
|
|
Installations supervised by State Licensed Master
Sign Electrician and Master Electrician |
|
|
State Licensed Sign Installers and State Licensed
Electricians will be used |
·
|
|
Maintenance Manual |
·
|
|
Free "Coming Soon" Parking-lot Sign |
|
|
Free Co-op Advertising Program |
|